<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Ethan Minerals Limited</title>
	<atom:link href="http://www.ethanminerals.com.au/feed" rel="self" type="application/rss+xml" />
	<link>http://www.ethanminerals.com.au</link>
	<description>Official website of Ethan Minerals Limited</description>
	<lastBuildDate>Tue, 06 Sep 2011 06:07:10 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.2</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<xhtml:meta xmlns:xhtml="http://www.w3.org/1999/xhtml" name="robots" content="noindex" />
		<item>
		<title>Indonesia</title>
		<link>http://www.ethanminerals.com.au/indonesia</link>
		<comments>http://www.ethanminerals.com.au/indonesia#comments</comments>
		<pubDate>Mon, 13 Dec 2010 16:45:39 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Projects]]></category>
		<category><![CDATA[slideshow]]></category>

		<guid isPermaLink="false">http://www.ethanminerals.com.au/?p=354</guid>
		<description><![CDATA[Gold Tiger Project
The Gold Tiger project is located in the province of Central Kalimantan, on the island of Borneo Indonesia. The project consists of five (5) mineral concession licenses in the Pujon area, of the Kapuas Tengah district within the Kapuas regency of Central Kalimantan province.
Based on previous exploration programs and geotechnical studies, the project [...]]]></description>
			<content:encoded><![CDATA[<p><strong>Gold Tiger Project</strong></p>
<p>The Gold Tiger project is located in the province of Central Kalimantan, on the island of Borneo Indonesia. The project consists of five (5) mineral concession licenses in the Pujon area, of the Kapuas Tengah district within the Kapuas regency of Central Kalimantan province.</p>
<p>Based on previous exploration programs and geotechnical studies, the project purports to contain wide spread, alluvial and primary hard rock gold mineralization. Within the project a discrete delineated alluvial project, containing a calculated gold reserve of 631,747 oz is reported.</p>
<p><a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/12/gold-tiger.jpg"><img class="aligncenter size-large wp-image-409" title="gold tiger" src="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/12/gold-tiger-1024x142.jpg" alt="" width="610" height="89" /></a></p>
<p><strong> </strong></p>
<p><strong>Gunung Mas Project</strong></p>
<p>The Gunung Mas Project lies in central Kalimantan near the Company’s Gold Tiger Project.  The geology comprises andesitic intrusive, with metamorphic lying to the south. A large tonalite intrusive has intruded the entire package.</p>
<p>Gold mineralization is known along the contract between the tonalite and the metamorphic. This appears to be a stockwork style, with individual veins ranging from 5cm to 1m in width. Sulphides are not noted as a major constituent of the mineralization located to date. Alluvial gold occurrences are also known to occur in active drainage to the south of the bedrock mineralisation.</p>
<p><a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/12/gunung-mas.jpg"><img class="aligncenter size-large wp-image-410" title="gunung mas" src="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/12/gunung-mas-1024x138.jpg" alt="" width="615" height="85" /></a><a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/12/indonesia_01.jpg"></a></p>
]]></content:encoded>
			<wfw:commentRss>http://www.ethanminerals.com.au/indonesia/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Africa</title>
		<link>http://www.ethanminerals.com.au/africa</link>
		<comments>http://www.ethanminerals.com.au/africa#comments</comments>
		<pubDate>Mon, 13 Dec 2010 16:44:21 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Projects]]></category>
		<category><![CDATA[slideshow]]></category>

		<guid isPermaLink="false">http://www.ethanminerals.com.au/?p=351</guid>
		<description><![CDATA[Kapumba Project
Kapumba is located in Central Zambia, approximately 80 kilometres east of Kawbe and is close to the Great North Road, the main artery for road transport infrastructure. The project has been in production for the past 50 years and is currently operating at a rate of approximately 650,000MT of manganese ore annually. The operation [...]]]></description>
			<content:encoded><![CDATA[<p><strong>Kapumba Project</strong></p>
<p>Kapumba is located in Central Zambia, approximately 80 kilometres east of Kawbe and is close to the Great North Road, the main artery for road transport infrastructure. The project has been in production for the past 50 years and is currently operating at a rate of approximately 650,000MT of manganese ore annually. The operation is an open cut mine with a run of grades which are typically above 50% and as high as 61% Mn.</p>
<p>Several occurrences of graphite and manganese are reported from the project area, notably the Kapumba manganese mine, with reported historical production of approximately 3 million MT of manganese ore grading above 50% Mn. The ore is closely associated with lenticular bodies of dolomite limestone, which form part of the tightly folded schists of the Lower Divison of the Basement Complex.</p>
<p>The deposits are believed to have been formed through the oxidation of primary manganese-bearing minerals, which are found as veins cutting across the calcareous rock. The manganese ore bodies occur over a distance of 2.5 kilometres along the top of the Kapmuba Hills, and form a residual capping over strongly folded manganiferous dolomites, intercalated with schists, gneisses and quartzite. The manganese content of the ore varies from 38% to 61% Mn. The true thickness reach is a maximum of 30 metres.</p>
<p><strong>Mufweshi Project</strong></p>
<p>The Mufweshi project is located in the Kasempa district of the North-western Province of Zambia, Kasempa Boma is the nearest town and is situated 180km from Solwezi and approximately 260km west of Kalulushi via a gravel road. The project area is roughly centered at 26’24’54’’ longitude and 13’15’18’’ latitude.</p>
<p>Recent exploration work by the Geological Survey Department of Zambia within the 40Ha small mining concession area ‘alone’ has been of great interest with rock chip and grab samples (21) taken from oxide material in a small active mining excavation returning significant Gold and Copper values ranging up 24.9% Cu and 46.5grm Au.</p>
<p><strong>Mkushi Project</strong></p>
<p>The Mkushi area is approximately 77km2 and encompasses five known manganese prospects which are located 20km from existing infrastructure including a railway loading station that runs to the port of Dar Es Salaam.</p>
<p>Arrangements are being made with port authorities of Dar Es Salaam to receive shipment of manganese ore.</p>
<p><a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/12/web.jpg"><br />
</a><a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/12/jhg.jpg"><img class="aligncenter size-large wp-image-404" title="jhg" src="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/12/jhg-1024x158.jpg" alt="" width="594" height="88" /></a></p>
]]></content:encoded>
			<wfw:commentRss>http://www.ethanminerals.com.au/africa/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Newsletters</title>
		<link>http://www.ethanminerals.com.au/newsletters</link>
		<comments>http://www.ethanminerals.com.au/newsletters#comments</comments>
		<pubDate>Wed, 24 Nov 2010 06:01:36 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Newsletters]]></category>

		<guid isPermaLink="false">http://www.ethanminerals.com.au/?p=305</guid>
		<description><![CDATA[Ethan Minerals Limited Newsletter &#8211; DayBreak &#8211; November 2010
]]></description>
			<content:encoded><![CDATA[<p><a href='http://www.ethanminerals.com.au/content/wp-content/uploads/2010/11/Ethan-Minerals-Limited-Newsletter-DayBreak-November-2010.pdf' target="_blank">Ethan Minerals Limited Newsletter &#8211; DayBreak &#8211; November 2010</a></p>
]]></content:encoded>
			<wfw:commentRss>http://www.ethanminerals.com.au/newsletters/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>The Prospector</title>
		<link>http://www.ethanminerals.com.au/the-prospector-2</link>
		<comments>http://www.ethanminerals.com.au/the-prospector-2#comments</comments>
		<pubDate>Sun, 24 Oct 2010 18:00:22 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[slideshow]]></category>

		<guid isPermaLink="false">http://www.ethanminerals.com.au/?p=232</guid>
		<description><![CDATA[The image of a prospector was chosen as Ethan Minerals Limited&#8217;s logo as prospectors formed part of Australia&#8217;s early history and represented a certain spirit of Australia. They were renowned and admired for their resilience, perseverance, pioneering courage and ability to turn obstacles into opportunities. In our company&#8217;s business practices, Ethan aims to reflect these [...]]]></description>
			<content:encoded><![CDATA[<p>The image of a prospector was chosen as Ethan Minerals Limited&#8217;s logo as prospectors formed part of Australia&#8217;s early history and represented a certain spirit of Australia. They were renowned and admired for their resilience, perseverance, pioneering courage and ability to turn obstacles into opportunities. In our company&#8217;s business practices, Ethan aims to reflect these values in concert with the values of honesty, integrity, caring and fairness.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.ethanminerals.com.au/the-prospector-2/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>ASX Media Releases</title>
		<link>http://www.ethanminerals.com.au/asx-media-releases</link>
		<comments>http://www.ethanminerals.com.au/asx-media-releases#comments</comments>
		<pubDate>Thu, 29 Jul 2010 14:08:42 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Media releases]]></category>
		<category><![CDATA[slideshow]]></category>

		<guid isPermaLink="false">http://www.ethanminerals.com.au/content/?p=43</guid>
		<description><![CDATA[July 2011
29th - Company Update &#8211; Meeting of Creditors
6th - Notice of First Meeting of Creditors
4th - Appointment of Administrator
4th - Director Resignation
June 2011
17th &#8211; ASX Announcement-17-06-2011
May 2011
3rd &#8211; Quarterly Report
3rd &#8211; Quarterly Cash Flow Report
3rd &#8211; Director Appointment
11th &#8211; ASX Announcement
March 2011
1st &#8211; Clarification of Suspension 
17th &#8211; Leases Update
22nd &#8211; Mary Springs Update
February 2011
1st &#8211; Response to [...]]]></description>
			<content:encoded><![CDATA[<h3>July 2011</h3>
<p>29th - <a href="http://stocknessmonster.com/news-item?S=ETH&amp;E=ASX&amp;N=550952">Company Update &#8211; Meeting of Creditors</a></p>
<p>6th - <a href="http://stocknessmonster.com/news-item?S=ETH&amp;E=ASX&amp;N=548126">Notice of First Meeting of Creditors</a></p>
<p>4th - <a href="http://stocknessmonster.com/news-item?S=ETH&amp;E=ASX&amp;N=547591">Appointment of Administrator</a></p>
<p>4th - <a href="http://stocknessmonster.com/news-item?S=ETH&amp;E=ASX&amp;N=547590">Director Resignation</a></p>
<h3>June 2011</h3>
<p>17th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/ASX-Announcement-17-06-2011.pdf">ASX Announcement-17-06-2011</a></p>
<h3>May 2011</h3>
<p>3rd &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2011/05/QtrlyReportASXRelease2011_05_03.pdf">Quarterly Report</a><br />
3rd &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2011/05/QrtlyCashFlowASXRelease2011_05_03.pdf">Quarterly Cash Flow Report</a><br />
3rd &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2011/05/DirectorAppointment_Resignation_ASXRelease2011_05_03.pdf">Director Appointment</a><br />
11th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2011/05/ASX-Announcement-11-05-2011.pdf">ASX Announcement</a></p>
<p><strong>March 2011</strong><br />
1st &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/Clarification-of-suspension-01.03.2011.pdf">Clarification of Suspension </a><br />
17th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/20110317_Leases_Update.pdf" target="_blank">Leases Update</a><br />
22nd &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/20110222_Additional_Zambian_Leases.pdf" target="_blank&gt;Additional Zambian Leases&lt;/a&gt;&lt;br /&gt; 24th - &lt;a href=">Mary Springs Update</a></p>
<p><strong>February 2011</strong><br />
1st &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/Repsonse-to-ASX-Price-and-Volume-Query.pdf">Response to ASX Price and Volume Query</a><br />
1st &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/Quarterly-Cashflow-Report-Amended-2011.pdf">Quarterly Cashflow Report Amended </a><br />
14th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/Company-Request-for-Trading-Halt1.pdf">Company Request for Trading Halt</a><br />
14th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/Trading-Halt-14.02.2011.pdf">Trading Halt</a><br />
16th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/Ethan-Clarifies-Position-on-Kafwa-Manganese-Project-Mkushi-Zambia-16.02.20111.pdf">Ethan Clarifies Position on Kafwa Manganese Project, Mkushi, Zambia </a><br />
17th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/Trading-Halt-17.02.2011.pdf">Trading Halt </a><br />
21st &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/Suspension-from-Offical-Qoutation-21.02.2011.pdf">Suspension from Official Quotation </a></p>
<p><strong>January 2011</strong><br />
5th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2011/01/932566.pdf">Appendix 3Y &#8211; Change of Director’s Interest Notice</a><br />
31st &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/Copy-of-Quarterly-Cashflow-Report-2011.pdf">Quarterly Cashflow Report </a><br />
31st &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/Copy-of-Quarterly-Acitivites-Report-20111.pdf">Quarterly Activites Report</a></p>
<p><strong>December 2010</strong><br />
1st &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/12/asx-media-release_2010-12-01_current-exploration.pdf" target="_blank">Current Exploration / Mining Interests</a><br />
1st &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/12/asx-media-release_2010-12-01_agm-report.pdf" target="_blank">AGM Report</a><br />
1st &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/12/asx-media-release_2010-12-01.pdf" target="_blank">First Annual General Meeting of Shareholders</a><br />
3rd &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/12/2010-12-03-Geos-Presentation-Part-B.pdf" target="_blank">Geos Presentation Part B</a><br />
3rd &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/12/2010-12-03-Geos-Presentation-Part-A.pdf" target="_blank">Geos Presentation Part A</a><br />
7th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/12/asx-media-release_2010-12-07_922014.pdf" target="_blank">Clarification of Geologists presentation</a><br />
8th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/12/asx-media-release_2010-12-08_AGM-2010.pdf" target="_blank">AGM 2010</a><br />
9th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/12/asx-media-release_2010-12-09_ClarificationofPreviousRelease.pdf" target="_blank">Clarification of Previous Release</a><br />
9th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/12/asx-media-release_2010-12-09_ClarificationGeologistPresentationPartA.pdf" target="_blank">Clarification Geologist Presentation Part A</a><br />
9th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/12/asx-media-release_2010-12-09_ClarificationtoAppendix3.pdf" target="_blank">Clarification to Appendix 3</a><br />
10th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/12/2010-12-09_Appendix-3B.pdf" target="_blank">New issue announcement, application for quotation of additional securities and agreement</a><br />
16th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/12/asx-media-release_2010-12-16_Appendix_3Y.pdf" target="_blank">Appendix 3Y</a><br />
16th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/12/asx-media-release_2010-12-16_EthanShareTradingPolicy.pdf" target="_blank">Ethan Share Trading Policy</a><br />
21st &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/12/Mary-Springs-Update-211210.pdf" target="_blank">Mary Springs Update</a><br />
31st &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/12/Mary-Springs-Update-Amended-Release-301210.doc" target="_blank">Mary Springs Update Amended Release</a></p>
<p><strong>November 2010</strong><br />
3rd &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/11/asx-media-release_2010-11-03_Gunung-Mas.pdf" target="_blank">Indonesia Project Update &#8211; Reconnaissance Exploration complete at Gunung Mas Project, Indonesia &#8211; 03/11/10</a><br />
3rd &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/Ethan-Recieves-Formal-Consent-03.11.2010.pdf">Ethan Recieves Formal Consent </a><br />
5th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/11/asx_media_release_041110.pdf" target="_blank">Mr Leonard Math Resigns as Company Secretary</a><br />
8th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/11/asx-media-release_2010-11-05.pdf" target="_blank">Announcement to correct appendixes 3X and 3Y</a><br />
16th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/11/asx-media-release_2010-11-16.pdf" target="_blank">Ethan completes $2.1M Equity Raising</a><br />
24th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/11/915897.pdf" target="_blank">Appendix 3X</a><br />
24th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/11/915896.pdf" target="_blank">Revised change of Director&#8217;s interest notices</a><br />
26th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/11/Becoming-a-substantial-shareholder.pdf" target="_blank">Becoming a substantial shareholder</a><br />
30th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/11/asx-media-release_2010-11-30.pdf" target="_blank">Ethan Minerals appoints Mr Kim France as Company Secretary and Accountant</a><br />
<strong> </strong></p>
<p><strong>October 2010</strong><br />
1st &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/10/ETH_Annual_Report_30_June_2010_FINAL-Lodgement.pdf" target="_blank">Ethan Annual Report 2010</a><br />
13th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/10/ETH-Kafwa-Project-Announcement-12.10.10.pdf" target="_blank">Kafwa Project Announcement</a><br />
14th &#8211; <a title="14th October - Board Changes" href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/10/ETH-Board-Changes-14.10.10-FINAL.pdf" target="_blank">Board Changes</a><br />
22nd &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/10/ETH-Highly-Prospective-Copper-Manganese-Mining-Leases-granted-at-the-Mufweshi-Mukonchi-Project-Areas-Zambia-221010-FINAL.pdf" target="_blank">Highly Prospective Copper Manganese Mining Leases granted</a><br />
25th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/10/Mary-Springs-ASX-Announcement-25th-Oct-2010-FINAL.pdf" target="_blank">Mary Springs Project Update</a><br />
27th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/10/Draft-Mary-Springs-Update-271010.pdf" target="_blank">Mary Springs Update</a><br />
27th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/10/ETH-Zambia-Manganese-Update-27-Oct-2010-FINAL.pdf" target="_blank&quot;">Zambia Manganese Update</a><br />
28th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/10/ETH-Gunung-Mas-Project-Update-281010-FINAL.pdf" target="_blank">Gunung Mas Project Update</a><br />
29th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/10/ETHAN-RECEIVES-FORMAL-RATIFICATION-OF-KAMPUMBA-MN-MINING-LEASES.pdf" target="_blank">Ethan receives formal ratification of Kampumba Mn Mining Leases</a><br />
29th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/10/Quarterly-Report-291010.pdf" target="_blank">Quarterly Report</a><br />
29th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/10/Notice-of-Annual-General-Meeting-291010.pdf" target="_blank">Notice of Annual General Meeting</a></p>
<p><strong>September 2010</strong><br />
2nd &#8211; <a href="http://stocknessmonster.com/news-item?S=ETH&amp;E=ASX&amp;N=503989" target="_blank">Appendix 3B &#8211; Release from Escrowed Securities</a><br />
16th &#8211; <a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/09/INDONESIA-ACTIVITIES-UPDATE-4.pdf" target="_blank">Indonesia Activities Update</a></p>
<p><strong>August 2010</strong><br />
2nd &#8211; <a href="http://stocknessmonster.com/news-item?S=ETH&amp;E=ASX&amp;N=500298" target="_blank">Appendix 3Y x 2</a><br />
10th &#8211; <a href="http://stocknessmonster.com/news-item?S=ETH&amp;E=ASX&amp;N=501127" target="_blank">Appendix 3B</a><br />
16th &#8211; <a href="http://stocknessmonster.com/news-item?S=ETH&amp;E=ASX&amp;N=501711" target="_blank">Appendix 3B</a><br />
18th &#8211; <a href="http://stocknessmonster.com/news-item?S=ETH&amp;E=ASX&amp;N=501947" target="_blank">Kafwa Manganese Project Update</a></p>
<p><strong>July 2010</strong><br />
6th - <a href="http://stocknessmonster.com/news-item?S=ETH&amp;E=ASX&amp;N=496639" target="_blank">Appendix 3B</a><br />
12th - <a href="http://stocknessmonster.com/news-item?S=ETH&amp;E=ASX&amp;N=497262">Resignation of Director<br />
</a>12th - <a href="http://stocknessmonster.com/news-item?S=ETH&amp;E=ASX&amp;N=497260" target="_blank">Extension on Due Diligence<br />
13th &#8211; </a><a href="http://stocknessmonster.com/news-item?S=ETH&amp;E=ASX&amp;N=497396">General Meeting Results<br />
</a><a href="http://stocknessmonster.com/news-item?S=ETH&amp;E=ASX&amp;N=497260" target="_blank">13th &#8211; </a><a href="http://stocknessmonster.com/news-item?S=ETH&amp;E=ASX&amp;N=497365" target="_blank">Trading Halt<br />
15th &#8211; </a><a href="http://stocknessmonster.com/news-item?S=ETH&amp;E=ASX&amp;N=497650" target="_blank">Ethan Confirms a 394,419 Tonne Lead Resource at Mary Springs</a><br />
30th &#8211; <a href="http://stocknessmonster.com/news-item?S=ETH&amp;E=ASX&amp;N=500052" target="_blank">Appendix 3B</a><br />
30th &#8211; <a href="http://stocknessmonster.com/news-item?S=ETH&amp;E=ASX&amp;N=500019" target="_blank">Quarterly Activities and Cashflow Report</a><br />
<a href="http://stocknessmonster.com/news-item?S=ETH&amp;E=ASX&amp;N=497365" target="_blank"></a><a href="http://stocknessmonster.com/news-item?S=ETH&amp;E=ASX&amp;N=497260" target="_blank"><br />
</a></p>
<p><strong>June 2010</strong><br />
<a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-06-01.pdf">1st &#8211; Appendix 3B</a><br />
<a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-06-02.pdf">2nd &#8211; Trading Halt</a><br />
<a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-06-03.pdf">3rd &#8211; Appendix 3B &#8211; Release of Escrowed Securities</a><br />
<a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-06-04.pdf">4th &#8211; Ethan Completes $2 Million Share Placement</a><br />
<a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-06-07.pdf">7th &#8211; Ethan Commences Trial Mining in Zambia</a><br />
<a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-06-09.pdf">9th &#8211; Appendix 3B</a><br />
<a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-06-11.pdf">11th &#8211; Notice of General Meeting/Proxy Form</a><br />
<a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-06-15.pdf">15th &#8211; Appendix 3B</a><br />
<a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-06-18.pdf">18th &#8211; Appendix 3B</a><br />
<a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-06-18_708A.pdf">18th &#8211; 708A Cleansing Statement</a><br />
<a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-06-25.pdf">25th &#8211; Drilling Confirms Mary Springs Resource Potential</a><br />
<a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-06-29.pdf">29th &#8211; Appendix 3B</a></p>
<p><strong>May 2010</strong><br />
<a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-05-11.pdf">11th &#8211; Addendum to Independent Resource Geologist&#8217;s Report</a><br />
<a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-05-20.pdf">20th &#8211; Ethan Signs Manganese JV in Zambia</a></p>
<p><strong>April 2010</strong><br />
<a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-04-12.pdf">12th &#8211; Successful Completion of Maiden Drilling Program</a><br />
<a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-04-16.pdf">16th &#8211; Appendix 3B &#8211; Release of Escrowed Securities</a><br />
<a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-04-19.pdf">19th &#8211; Trading Halt</a><br />
<a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-04-20.pdf">20th &#8211; Trading Halt Request</a><br />
<a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-04-22.pdf">22nd &#8211; Suspension from Official Quotation</a><br />
<a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-04-22_suspension-request.pdf">22nd &#8211; Request for Suspension</a><br />
<a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-04-27.pdf">27th &#8211; Ethan Minerals Signs &#8216;MOU&#8217; in Indonesia</a><br />
<a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-04-27_reinstatement.pdf">27th &#8211; Reinstatement to Official Quotation</a><br />
<a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-04-30.pdf">30th &#8211; Quarterly Activities and Cashflow Report</a></p>
<p><strong>March 2010</strong><br />
<a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-03-05.pdf">5th &#8211; </a><a href="http://stocknessmonster.com/news-item?S=ETH&amp;E=ASX&amp;N=482816">Further High Grade Base Metals Intercepts<br />
</a><a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-03-15.pdf">15th &#8211; Multiple Parallel Zones Of Mineralisation Identified<br />
</a><a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-03-16_half-year-financial-report.pdf">16th &#8211; Half Yearly Accounts<br />
</a><a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-03-31.pdf">31st &#8211; Release of Escrowed Securities<br />
</a><a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-03-31_appendix-3b.pdf">31st &#8211; Appendix 3B</a></p>
<p><strong>February 2010</strong><br />
<a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-02-19.pdf">19th &#8211; RC Drilling Reveals High Grade Base Mineralisation<br />
</a><a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-02-24.pdf">24th &#8211; Diamond Drilling Program Commenced</a></p>
<p><strong>January 2010<br />
<span style="font-weight: normal;"><a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-01-08.pdf">8th &#8211; Recommencement of Drilling Program</a></span></strong></p>
<p><strong><span style="font-weight: normal;"><strong>Decemeber 2009</strong><br />
<a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/asx-media-release_2010-01-29.pdf">29th &#8211; Quarterly Activities and Cashflow Report</a></span></strong></p>
]]></content:encoded>
			<wfw:commentRss>http://www.ethanminerals.com.au/asx-media-releases/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Northampton</title>
		<link>http://www.ethanminerals.com.au/northampton</link>
		<comments>http://www.ethanminerals.com.au/northampton#comments</comments>
		<pubDate>Wed, 28 Jul 2010 18:20:38 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Projects]]></category>
		<category><![CDATA[slideshow]]></category>

		<guid isPermaLink="false">http://www.ethanminerals.com.au/content/?p=36</guid>
		<description><![CDATA[This project is comprised of seven Queen Victoria Crown Grants as well as exploration licences E66/56, E66/64, E66/53 and E66/73. QVCGs are privately owned areas of land that were granted during Queen Victoria’s reign in the 1800’s and the minerals rights are alienated from the Crown.
Ethan’s entire land holding has good access from the North [...]]]></description>
			<content:encoded><![CDATA[<p>This project is comprised of seven Queen Victoria Crown Grants as well as exploration licences E66/56, E66/64, E66/53 and E66/73. QVCGs are privately owned areas of land that were granted during Queen Victoria’s reign in the 1800’s and the minerals rights are alienated from the Crown.</p>
<p>Ethan’s entire land holding has good access from the North West Coastal Highway, the Northampton to Port Gregory Road and the Kalbarri to North West Coastal Highway and by well maintained gravel roads and tracks to the prospects. Ravensgate have researched and compiled extensive notes on the Northampton project which are summarised in the following sections.</p>
<p>Western Australia’s first mining operations were undertaken based on the lead-silver and copper, vein-type deposits in the Northampton Complex with more than 100 deposits worked between 1850 and 1973 in the three main centres of Northampton, Galena and Narra Tarra. The overall historical production is conservatively estimated at 77,000 tonnes lead, 4,268 tonnes copper, 42.3 tonnes zinc and 212.3kg silver.</p>
<p><strong>Mary Springs Lead Mine</strong><br />
The Mary Springs Mine is located less than 500m from the Northwest Coastal Highway and 80km north of the township of Northampton. During the period 1951 to 1967 the mine produced 925 tonnes of lead ore and concentrates. From 1967 to 1969 Canadian Southern Cross Mines NL (CSC) mined 3,508 tonnes of lead ore containing 530 tonnes of lead metal extracted from three parallel ore shoots generally striking at 030° and dipping to the west at 70°.</p>
<p>Where the ore is observed in pillars the ore is 1.2 to 1.5m wide and is comprised of quartz and sulphides with 30% to 40% galena with veins of massive galena up to 30cm thick present on the footwall side of the lode. Ethan’s Directors have been shown photographs of underground workings taken by the last miners at the site showing galena veins approximately 1.5 to 2 metres wide.</p>
<p><strong>Scott and Gales, Kathleen Hope and Martin Springs Mines</strong><br />
The three mines are located 8km north west of Northampton. Scott and Gales Mine is about 300m south of the old Martin Springs Copper Mine and consists of two shafts about 40m apart. The lode is made up of malachite, azurite, chalcocite, galena and cerussite, but is poorly defined and requires further exploration work.</p>
<p>The Kathleen Hope Mine is located just south of Scott and Gales Mine. Production was first recorded in 1957 and over the next ten years the mine produced 23.3 tonnes of lead metal and 808 grams of silver from 371.8 tonnes of ore.</p>
<p>The Martin Springs Mine is located 300m north of Scott and Gales Mine and was largely a copper producer. No further information was available from historical records.</p>
<p><strong>Wheal Fortune, Wheal Fortune extended and the Paringa mines</strong><br />
This trio of mines is located 5km west north west of Northampton and lies within a shear line trending 040°-050°N and dipping 70°W or more to the southeast and consists of a number of parallel, en echelon shears with richer zones occurring where the shears intersect pegmatite. Individual ore shoots plunge south with ore zones up to 1.2m wide. Ore minerals include galena, sphalerite, chalcopyrite and pyrite in the primary zone with malachite, azurite, covellite, chalcocite and native copper in the oxidised and supergene zones.</p>
<p>The Wheal Fortune copper and lead mine was worked from 1862 to 1868 over a length of 223m and to a depth of 90 m. The Wheal Fortune Mine produced 3,015 tonnes of lead ore at 75% Pb and 2,681 tonnes of copper ore at 17% Cu.</p>
<p>The Wheal Fortune Extended Mine connected with the Wheal Fortune Mine at the 55m level.</p>
<p>At the northerly Paringa Mine, the ore is located in shears striking at between 030°-040°. The shears cut garnet granulites which have been invaded by pegmatites. While mylonitic shears cut the Paringa lodes, it is not certain whether they relate to ore forming processes.</p>
<p>The total production for all three mines from 1899 was 44,753 tonnes of ore for 4,428 tonnes of lead and 28 kilograms of silver.</p>
<p><strong>Kirtons South, Kirtons North, Kirtons North Extended and Kirtons Group of Mines</strong><br />
The Kirtons Group of Mines is located 6.5km west-northwest of Northampton. During the main period of production, underground mining was carried out at the Kirtons North Extended Mine where a shoot was stoped over a length of 70m and a width of between 0.90m and 1.2m. The Kirtons North Extended lodes contained galena, cerussite and copper minerals.</p>
<p>The Kirtons North Mine has many similar features to the Kirtons North Extended Mine which was mined discontinuously over a length of some 60m. Where mined, the mineralised section was 0.60m to 0.90m in width, with galena and cerussite occurring in the northern workings and copper and oxidised zinc minerals in the southernmost shaft.</p>
<p><strong>The Baddera Group</strong><br />
The Baddera Group is located some 9km north of Northampton and 1.5km by dirt road east of the North-West Coastal Highway with two mines having been worked on the property, the Baddera and the Baddera North. Discovered in 1873 the mine was worked for a period of 10 years to a depth of 30m. Production figures are not available for this period except for one production record of 687.8 tonnes of concentrate averaging 72% Pb.</p>
<p>The mine was reopened in 1910 and worked until 1920 with production figures of 14,200 tonnes of lead metal from 132,000 tonnes of ore for an average grade of about 11%Pb. The Baderra North Mine was worked from 1946 through to 1954 with recorded production of 731 tonnes of lead from 15,200 tonnes of ore for an average grade of about 5%Pb.</p>
<p>At the Baderra Mine, discontinuous lenses of galena occur within a lode shear 2.5m in width striking 050° and dipping 70° to the west. The mineralised shear is located in granulite, pegmatite and quartz.</p>
<p>The Baddera ore bodies occur on cymoid loop structures formed where two bands of massive glassy quartz have been intersected by the lode shear. The two bands of quartz trend at 030° sub-parallel to the local foliation of the country rocks. The two branches of the shear (the cymoid loop) are exposed at the southern end of the Baddera Mine and can be followed in the surface workings and rejoin in the southernmost open pit. At surface, the Baddera workings extend for about 130m.</p>
<p><strong>Rhyhope Mine</strong><br />
The Rhyhope Mine is located 3km west of Northampton and located south of the Northampton – Port Gregory Road. The Rhyhope lode follows a shear zone in gneiss striking at 025° and dipping easterly with the lode consisting of crushed gneiss with minor quartz and pyrite, galena, sphalerite and barite.</p>
<p><img title="mary springs" src="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/mary-springs-1024x175.jpg" alt="" width="606" height="99" /></p>
<p>To date, the company has focused on the Mary Springs area, but a significant number of former producing mines remain to be explored by modern exploration techniques. Rocks of the Northampton Complex are dominated by granites, migmatites and granulites.</p>
<p>Recent targeting work completed by the company has utilised Landsat imagery to define new targets. A total of 17 targets have been defined to date. Ethan will prioritise these targets and assess them following a compilation of all available historical drilling. There are a number of historic exploration reports dating back to the 1800&#8217;s that will need to be entered into a comprehensive electronic data base prior to assessment.</p>
<p>In the interim, Ethan Minerals Limited will complete an RC Drilling Program at Mary Springs to infill and potentially expand the current resource. A total of 14 holes for approximatley 1200m are proposed for this program.</p>
<p><a href="http://www.ethanminerals.com.au/content/wp-content/uploads/2010/07/mary-springs.jpg"></a></p>
]]></content:encoded>
			<wfw:commentRss>http://www.ethanminerals.com.au/northampton/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

